Aug 31
Bid ended

12-R-8036 MBCI Pearl River Wastewater Treatment Plant Rehab

(H-NR)

Status

Bidding Closed

Bid Date8/31/18 10:00 am

Company & Contacts

Engineering Service

Lori McIntire   601-939-8737

Location

Neshoba County, MS

Engineer’s Estimate of Probable Cost $3,400,000

Sealed Bids for the construction of the Pearl River Wastewater Treatment Plan Renovations (USDA RUS
Grant Phase VI) will be received by Mississippi Band of Choctaw Indians at the MBCI Department of Public Works, located at 258 Industrial Road in the Pearl River Community, Choctaw, Mississippi until 10:00 a.m. local time on August 31, 2018, at which time the Bids received will be opened and read aloud.

The Project consists of: Renovations of the existing treatment facility including equipment replacement,
addition of new head-works, demolition of specific existing facilities, new concrete paving, and
overlaying existing asphalt paving.