May 9
Bid ended
22-E-8053 Donna Circle Drainage Improvements #18004
(HT-NR-E) The Project includes the following Work: Excavation and grading of existing tributary to Neely Creek as well as armoring the bank of a portion of Neely Creek.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Add #1 COMBINED FINAL signed | 563.8 KB |
Clarification
(click to expand/collapse)
(click to expand/collapse)
Bedding material required for pipe installation on addendum 01 will be absorbed in pricing for piping (LS)


