May 9
Bids in
7 days
22-E-8053 Donna Circle Drainage Improvements #18004
(HT-NR-E) The Project includes the following Work: Excavation and grading of existing tributary to Neely Creek as well as armoring the bank of a portion of Neely Creek.
Specs
(click to expand/collapse)

Name | Size | ||
SPECS 03.31.2025 signed | 3.7 MB |