May 9
Bids in
7 days

22-E-8053 Donna Circle Drainage Improvements #18004

(HT-NR-E) The Project includes the following Work: Excavation and grading of existing tributary to Neely Creek as well as armoring the bank of a portion of Neely Creek.
Specs (click to expand/collapse)
Name Size
SPECS 03.31.2025 signed 3.7 MB